SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £200k
Contract – JCT Standard Build
Scope – Construction of new 1.8m deep Machine Pit
- Saw cutting and breaking out existing concrete slab
- Excavation of 12m x 14m x 2m Deep Pit
- Installation of Tanking and Waterbar to area
- Casting new reinforced concrete floor slab and walls
- Epoxy Paint finish to floor and painted walls.
- Installation of handrail and Steps.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems












