SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS

Value – £1.8m Contract

Contract – JCT Design and Build

Scope – External Canopy Extension and associated MEP Works

Achievement – Project delivered with Stage 4 Design Value Engineering totaling savings of £200,000.

  • 105m Long Canopy Extension.
  • Installation of new drainage and attenuation tank
  • Installation of new lighting and sprinklers.
  • 1600m2 concrete slab replacement to HGV Specification.
  • New roller shutter doors and openings formed into existing building.
  • Working around live manufacturing environment without disruption.

PROJECT GALLERY

OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions

EXPLORE OUR CIVIL ENGINEERING PROJECTS

OUR SERVICES

OUR SECTORS