CMS CEPCOR PIT CREATION
CMS CEPCOR PIT CREATION
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £200k
Contract – JCT Standard Build
Scope – Construction of new 1.8m deep Machine Pit
- Saw cutting and breaking out existing concrete slab
- Excavation of 12m x 14m x 2m Deep Pit
- Installation of Tanking and Waterbar to area
- Casting new reinforced concrete floor slab and walls
- Epoxy Paint finish to floor and painted walls.
- Installation of handrail and Steps.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
CAZOO ST HELENS
CAZOO ST HELENS
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £525k
Contract – JCT Design and Build
Scope – 70,000 Sq Ft Groundworks Package to new Building
- 1m High 30m long Concrete reinforced concrete retaining wall
- 1600m2 Reinforced Powerfloated Concrete slab yard
- Grading and levelling of yard with Tarmac
- Pad Foundations to new steel structure
- External Drainage Package
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems