KOITO EUROPE FACTORY EXTENSION
KOITO EUROPE FACTORY EXTENSION
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £950k
Contract – JCT Design & Build Contract
Scope – 55,000 sq ft insulated extension to existing factory works
- 2m high, 80m long reinforced concrete wall
- 1100 sqm reinforced concrete slab yard
- 4 no air lock rapid roller shutter doors & sock levelers
- Steel portal frame & insulated cladding
- Internal mezzanine installation & fit out
- Staircases & fire escape doors
- Formation of new bell mouth to entrance of the site
- Widening of access road & perimeter fencing (palisade)
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
BMW NORTH DECK EXTENSION
BMW NORTH DECK EXTENSION
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £1.8m Contract
Contract – JCT Design and Build
Scope – External Canopy Extension and associated MEP Works
Achievement – Project delivered with Stage 4 Design Value Engineering totaling savings of £200,000.
- 105m Long Canopy Extension.
- Installation of new drainage and attenuation tank
- Installation of new lighting and sprinklers.
- 1600m2 concrete slab replacement to HGV Specification.
- New roller shutter doors and openings formed into existing building.
- Working around live manufacturing environment without disruption.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems