BMW HAMS HALL SITE RESURFACING
BMW HAMS HALL SITE RESURFACING
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £467k
Contract – BMW Terms and Conditions
Scope – 23,675 m2 Resurfacing to main Employee Car Park
- Plane off existing surface course to car park in 3 Phases
- Supply and lay new Tarmac surface to car park
- White lining and directional lining
- Re-fitting of ironworks and traffic calming measures.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
MANRESSA HOUSE EXTERNAL WORKS
MANRESSA HOUSE - EXTERNAL WORKS
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £800k
Contract – JCT Design and Build
Scope – Groundworks and External Hard Landscaping Package
- Cut and Fill exercise.
- Foundations for 5 No new Buildings
- External Surface and Foul Water Drainage Systems
- Retaining walls for ramps and basements
- External paving and resin bound paths.
- External Car park and tarmac works including line marking.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
CAZOO ST HELENS
CAZOO ST HELENS
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £525k
Contract – JCT Design and Build
Scope – 70,000 Sq Ft Groundworks Package to new Building
- 1m High 30m long Concrete reinforced concrete retaining wall
- 1600m2 Reinforced Powerfloated Concrete slab yard
- Grading and levelling of yard with Tarmac
- Pad Foundations to new steel structure
- External Drainage Package
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
KOITO EUROPE FACTORY EXTENSION
KOITO EUROPE FACTORY EXTENSION
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £950k
Contract – JCT Design & Build Contract
Scope – 55,000 sq ft insulated extension to existing factory works
- 2m high, 80m long reinforced concrete wall
- 1100 sqm reinforced concrete slab yard
- 4 no air lock rapid roller shutter doors & sock levelers
- Steel portal frame & insulated cladding
- Internal mezzanine installation & fit out
- Staircases & fire escape doors
- Formation of new bell mouth to entrance of the site
- Widening of access road & perimeter fencing (palisade)
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems

Environmental and Sustainability Solutions
BMW NORTH DECK EXTENSION
BMW NORTH DECK EXTENSION
WE MAKE IT POSSIBLE
SUSTAINABLE CONSTRUCTION THAT DELIVERS RESULTS
Value – £1.8m Contract
Contract – JCT Design and Build
Scope – External Canopy Extension and associated MEP Works
Achievement – Project delivered with Stage 4 Design Value Engineering totaling savings of £200,000.
- 105m Long Canopy Extension.
- Installation of new drainage and attenuation tank
- Installation of new lighting and sprinklers.
- 1600m2 concrete slab replacement to HGV Specification.
- New roller shutter doors and openings formed into existing building.
- Working around live manufacturing environment without disruption.
OUR CIVIL ENGINEERING SERVICES INCLUDE:

Infrastructure Design and Planning

Road and Car Park Construction

Water and Sewage Systems